P112

36 social housing units in Eibar

Type Public residential housing
Year 2025
Location Eibar, Gipuzkoa
Client Visesa
Contractor Construcciones Urdinberri
About the project

A project driven by Visesa that promotes the transformation of architecture and construction through the implementation of an industrialized facade system developed by Enerblock.

The combination of traditional construction systems, such as concrete structures, with industrialized solutions makes it possible to optimize execution timelines, reduce on-site labor requirements and minimize indirect costs, providing greater control, efficiency and predictability to the construction process.

Solutions used

04
04

Enerblock System®

Enerblock System®

Surface

2.200

m² built

Timeline

16

Construction weeks

Tell us about your project and we will advise you on the fit, scope, and options of the Enerblock System®, as well as how to integrate it into your project and the most suitable level of industrialized components based on your design objectives, technical and regulatory requirements, and timelines.

Build with an industrialized and digital system

Contact Contact